
Device Profile
Masin kënë ye luɔɔi ye dɔɔni, ye mɛn juëc ye kek looi, ye mɛn juëc ye kek looi, ye mɛn juëc ye kek looi, ye mɛn juëc ye kek looi, ye mɛn juëc ye kek looi, ye mɛn juëc ye kek looi
Masin kënë ye luui në biäk ye cɔl stainless steel network belt ye looi në biäk ye cɔl stainless steel network belt ye looi në biäk ye cɔl stainless steel network belt ye looi në biäk ye cɔl stainless steel network belt ye looi në biäk ye cɔl stainless steel network belt ye looi në biäk ye cɔl stainless steel network belt ye Furnace kënë ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony ye kony Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ t
Struktur Device Diagram

Parameters teknis:
Puɔ̈ɔ̈l: 0.75KW
Kuɛl: 36KW
Lɛɛr: 1 ~ 1500r / min
Modalité de régulation de vitesse: régulation de vitesse de glissement
Dimension: 6700 × 1150 × 1750mm
Luɔi:
1.Put oven on flat, solid ground, first install the wind feeder each ventilation pipeline completed, according to the wind feeder tube length adjust the three-layer distance between the oven and the wind feeder, until it is suitable. 1.Put the oven on flat, solid ground, first install the wind feeder each ventilation pipeline completed, according to the wind feeder tube length adjust the three-layer distance between the oven and the wind feeder, until it is suitable.
2.With 380V three phase four wire (BVR10mm × 4), with 100A wall air switch, connect the power supply, to connect each wire end on the oven to the control cabinet corresponding location. 380V three phase four wire (BVR10mm × 4), with 100A wall air switch, connect the power supply, to connect each wire end on the oven to the control cabinet corresponding location.
3.After connecting each wire end, connect the power supply test operation, to see if the operating direction of the network belt and the operating speed correspond to your requirements. 3.After connecting each wire end, connect the power supply test operation, to see if the operating direction of the network belt and the operating speed correspond to your requirements.
