PP Pipe Fittings Installation Method 1. Pipe, pipe fittings adhere, apply dry cloth to bearing side and plug outer side wipe treatment, when the surfa
Detalji proizvoda

PP Pipe Installation Method

1.Before the pipe, pipe parts are bonded, apply dry cloth will wipe the bearing side and the plug outside treatment, when the surface sticks to oil contamination should be wiped clean with acetone. 1.Before the pipe, pipe parts are bonded, apply dry cloth will wipe the bearing side and the plug outside, when the surface sticks to oil contamination should be wiped clean with acetone.

2. Pipe section should be flat, vertical tube axis and be reversed angle treatment. Pipe section should be flat, vertical tube axis and be reversed angle treatment. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka t

3.When you apply the adhesive, you should first apply the inner side of the bearing, then apply the outer side of the plug, when you apply the bearing should be applied in parallel from the inside to the outside, you should not leak or apply excess amount (200g/m2).

4.After the adhesive is applied, it is appropriate to keep the external force applied unchanged in 1 minute, to keep the straightness and position of the interface correct. 4.After the adhesive is applied, it is appropriate to keep the external force applied unchanged in 1 minute, to keep the straightness and position of the interface correct.

5. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ

6. Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl

7. Connection program: prepare → clean work surface → try plug → brush adhesive → stick → maintain.