Kä ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u ye kek tɔ̈ɔ̈u Pɛɛ̈ɛ̈r ye kɔnɔ tɛ̈ɛ̈r ye kɔnɔ tɛ̈ɛ̈r ye kɔnɔ tɛ̈ɛ̈r ye kɔnɔ tɛ̈ɛ̈r ye kɔnɔ tɛ̈ɛ̈r ye k Kä ye kek tɔ̈ɔ̈u në tɛ̈n yenë kek tɔ̈ɔ̈u në tɛ̈n yenë kek tɔ̈ɔ̈u në tɛ̈n yenë kek tɔ̈ɔ̈u në tɛ̈n yenë
Kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th ye kɔnɔ̈ɔ̈th
Lɔ̈ɔ̈i ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ
Watermelon peach cold storage board of long, high, wide general manufacturers are pre-fixed production, selected for the majority of density 40 or so of polyammonium cold storage board, but can be customized production according to the customer's requirements, then according to the actual situation.
Kä wïc bï kek ya looi në ɣän ke kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc
1. Luɔ̈ɔ̈i ye cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler ye kɛ cooler
2. Gas cï bɛ̈n tɔ̈ɔ̈u në ɣän ke kɔc cï puɔ̈ɔ̈c de kɔc cï puɔ̈ɔ̈c de kɔc cï puɔ̈ɔ̈c de kɔc cï puɔ̈ɔ̈c de kɔ
3.Exhaust pipe should slope to the outside storage, the inlet air pipe cold room pipe section slope to the cold wind machine, the wind pipe lowest point should have dropping water measures.
4.Cool storage lighting system, cable cooling system, insulation material selection, wire, cooling compressor, cooling fan, expansion valve, all can be based on customer opinions, combined with the actual situation, change and change, to maximize customer needs. 4.Cool storage lighting system, cable cooling system, insulation material selection, wire, cooling compressor, cooling fan, expansion valve, all can be based on customer opinions, combined with the actual situation, change and change, to maximize customer needs.
Design Installation Process for Watermelon Peach Cold Storage
1.Customer service staff get a customer's consulting call to understand the customer's cold storage needs, then convey to the designer. 1.Customer service staff get a customer's consulting call to understand the customer's cold storage needs, then convey to the designer.
2. Designer nɔŋ raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan.
3.Customer audit design plan, program pass, then start cold storage construction installation, otherwise do design plan, until program audit pass.
4. Cold storage construction finished, work condition all is normal, then delivered to customer acceptance, customer acceptance succeeded, surface project construction finished. 4. cold storage construction finished, work condition all is normal, then delivered to customer acceptance, customer acceptance succeeded, surface project construction finished.
Kä ye kek tɔ̈ɔ̈u në kë ye kek tɔ̈ɔ̈u në cold storage
1. Fɔɔlɔ, a tɔ̈ɔ̈u peech ye tɔ̈ɔ̈u bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i b
2. Ka tɔ̈ɔ̈u ka carbon dioxide remover wala ethylene absorber tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
3. Dɛmɛ, tɔ̈ɔ̈u bɛ̈ɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r bɛ̈ɛ̈r
Water Honey Peach Cooling Cooling Machine Technical Parameters
| Model | Nominal cooling volume | Dɛɛr ye kɔl (m²) | Dɛɛr (mm) | Fan |
Electrical Thermal Tube |
Kɔɔr (kg) | ||||||||
| Nomer (kɛl) | Diameter D ((mm)) | Pɛɛr (m²/h) | Wind pressure Pa ((mmH₂O) | Range ((m)) | Fan Power ((w)) | Motor Voltage ((v)) | Kuen (kw) |
Pii (kw) | Voltage ((v)) | |||||
| DL-5.2/25 | 5200(4450) | 25 | 4.5 | 3 | ∅330 | 3*1700 | 98(10) | 8 | 3*90 | 380 | 1.8 | 0.6 | 220 | 59 |
| DL-3.1/15 |
3100(2650) | 15 | 4.5 | 2 | ∅330 | 2*1700 | 98(10) | 8 | 2*90 | 380 | 1.2 | 0.4 | 220 | 43 |
| DL-25.8./125 | 25800(22200) | 125 | 4.5 | 3 | ∅500 | 3*6000 | 167(17) | 15 | 3*550 | 380 | 3.8 | 1.9 | 220 | 165 |
| DL-2.1/10 | 2100(1800) | 10 | 4.5 | 1 | ∅330 | 1700 | 98(10) | 8 | 90 | 380 | 0.9 | 0.4 | 220 | 30 |
Tabel dɔ ye model dɔ ye sɛbɛn, parameters ye yɛlɛma, ka tɛ̈n lɛ̈k.
